Skip to content

Polish pass and projector dry run (meeting readiness) #10

@JoeBurd-code

Description

@JoeBurd-code

Parent

#3 (PRD: Meeting frontend, real-line SVG walkthrough prop)

What to build

Final quality pass before the engineer meeting on Monday 2026-06-16, finished with a human dry run. Sweep the full line for label collisions and unreadable text at presentation zoom levels, verify hover/selection affordances on every machine, check arrow legibility, spacing discipline, and popup behaviour for every machine in the data. Then a dry run with the user at projector-like resolution, walking all three zones as the meeting will, and fixing anything that trips.

Acceptance criteria

  • No overlapping labels or clipped text at Fit All or any zone framing
  • Every machine: hover affordance, click selection, popup opens with correct spec + questions
  • Walkthrough exercise passes: source stub to all three product endpoints can be traced by arrows alone
  • npm run lint clean; all Vitest suites green; npm run build succeeds
  • Dry run completed with the user at presentation resolution; sign-off given
  • Any corrections from the dry run applied and re-verified

Blocked by

Metadata

Metadata

Assignees

No one assigned

    Labels

    needs-triageMaintainer needs to evaluate this issue

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions