Part of #1 (M0). Closes the benchmark phase. ## Goal Synthesize M0.1-M0.4 into a written decision and a measured (not modeled) time estimate. ## Acceptance - Chosen: WASM secp build, hashing approach, OPFS layout, SAB-or-not. - A revised end-to-end time model per tier, using real numbers. - Re-validate the epic (#1) perf table against measurements; correct it where the model was wrong. - Go/no-go on Tier 2 (full from-genesis) feasibility on commodity hardware.
Part of #1 (M0). Closes the benchmark phase.
Goal
Synthesize M0.1-M0.4 into a written decision and a measured (not modeled) time estimate.
Acceptance