Skip to content

Phase 14: Run required targets and one VS Code stress validation #161

@jununfly

Description

@jununfly

This was generated by AI during triage.

Parent

Parent tracking issue: #154

What to build

Run the canonical Phase 14 formal experiment for the required decision targets, then run at least one VS Code stress validation after the confirmed trigger condition is met. This is the HITL validation slice because it requires maintainer review of generated evidence and follow-up judgment on blockers exposed by the stress target.

Required decision targets are zcodegraph and excalidraw. VS Code is a stress target / optional extended evidence: stress failures do not block required-target decision readiness, but they must be captured and turned into follow-up issues when they expose new blockers.

Acceptance criteria

  • Canonical formal experiment is run for zcodegraph and excalidraw.
  • Required-target raw artifact is produced.
  • Required-target decision summary draft is produced.
  • The generated decision summary draft is reviewed by a maintainer.
  • If required targets meet the confirmed trigger condition, at least one VS Code stress validation is run.
  • VS Code stress raw artifact is produced after trigger conditions are met.
  • Stress target failures do not block required-target decision readiness.
  • New blockers exposed by stress validation are captured as follow-up issues.

Blocked by

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementNew feature or requestready-for-humanNeeds human implementation or judgment

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions