Skip to content

[PR Feedback] Repository Hygiene #12

Description

@tinkermonkey

Based on consolidated PR review, address the following in Repository Hygiene:

  • .repair_cycle.log (5412 lines) committed to repository: A large internal orchestration/CI debug log is checked into version control. .dockerignore already excludes it, confirming it is not intended for the repo. .gitignore lacks a *.log entry, which allowed it through. Must be removed via git rm and *.log added to .gitignore. /workspace/.repair_cycle.log:1
  • .mcp.json developer config committed to repository: A developer-local MCP server configuration file (pointing to https://mcp.context7.com/mcp) is checked in. .dockerignore already excludes it. Must be removed via git rm and .mcp.json added to .gitignore. /workspace/.mcp.json:1

Created by PR Review Stage - Consolidation Phase


Concurrent Fix Issues (Same Review Cycle)

The following issues are being fixed simultaneously in this review cycle. Check these issues for any files they modify before making your own changes to avoid introducing conflicts:

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions